1
Commit Graph

87 Commits

Author SHA1 Message Date
Ingo Molnar
bbdba7c0e1 sched: remove wait_runtime fields and features
remove wait_runtime based fields and features, now that the CFS
math has been changed over to the vruntime metric.

Signed-off-by: Ingo Molnar <mingo@elte.hu>
Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl>
Signed-off-by: Mike Galbraith <efault@gmx.de>
Reviewed-by: Thomas Gleixner <tglx@linutronix.de>
2007-10-15 17:00:06 +02:00
Ingo Molnar
e22f5bbf86 sched: remove wait_runtime limit
remove the wait_runtime-limit fields and the code depending on it, now
that the math has been changed over to rely on the vruntime metric.

Signed-off-by: Ingo Molnar <mingo@elte.hu>
Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl>
Signed-off-by: Mike Galbraith <efault@gmx.de>
Reviewed-by: Thomas Gleixner <tglx@linutronix.de>
2007-10-15 17:00:06 +02:00
Dmitry Adamushko
495eca494a sched: clean up struct load_stat
'struct load_stat' is redundant now so let's get rid of it.

Signed-off-by: Dmitry Adamushko <dmitry.adamushko@gmail.com>
Signed-off-by: Ingo Molnar <mingo@elte.hu>
Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl>
Signed-off-by: Mike Galbraith <efault@gmx.de>
Reviewed-by: Thomas Gleixner <tglx@linutronix.de>
2007-10-15 17:00:06 +02:00
Ingo Molnar
7a62eabc4d sched: debug: update exec_clock only when SCHED_DEBUG
micro-optimization: update cfs_rq->exec_clock only if
CONFIG_SCHED_DEBUG=y.

Signed-off-by: Ingo Molnar <mingo@elte.hu>
Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl>
Signed-off-by: Mike Galbraith <efault@gmx.de>
Reviewed-by: Thomas Gleixner <tglx@linutronix.de>
2007-10-15 17:00:06 +02:00
Peter Zijlstra
9014623c0e sched: handle vruntime 64-bit overflow
Handle vruntime overflow by centering the key space around min_vruntime.

( otherwise we could overflow 64-bit vruntime in a few days with SCHED_IDLE
 tasks - or in a few years with nice +19. )

Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl>
Signed-off-by: Ingo Molnar <mingo@elte.hu>
Signed-off-by: Mike Galbraith <efault@gmx.de>
Reviewed-by: Thomas Gleixner <tglx@linutronix.de>
2007-10-15 17:00:05 +02:00
Peter Zijlstra
94dfb5e75e sched: add tree based averages
add support for tree based vruntime averages.

Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl>
Signed-off-by: Ingo Molnar <mingo@elte.hu>
Signed-off-by: Mike Galbraith <efault@gmx.de>
Reviewed-by: Thomas Gleixner <tglx@linutronix.de>
2007-10-15 17:00:05 +02:00
Ingo Molnar
28a1f6fa2f sched: remove SCHED_FEAT_SKIP_INITIAL
remove SCHED_FEAT_SKIP_INITIAL - it was off by default and even
when enabled it never made any real difference.

Signed-off-by: Ingo Molnar <mingo@elte.hu>
Reviewed-by: Thomas Gleixner <tglx@linutronix.de>
2007-10-15 17:00:05 +02:00
Peter Zijlstra
aeb73b0403 sched: clean up new task placement
clean up new task placement.

Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl>
Signed-off-by: Ingo Molnar <mingo@elte.hu>
Signed-off-by: Mike Galbraith <efault@gmx.de>
2007-10-15 17:00:05 +02:00
Ingo Molnar
2e09bf556f sched: wakeup granularity increase
increase wakeup granularity - we were overscheduling a bit.

Signed-off-by: Ingo Molnar <mingo@elte.hu>
Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl>
Signed-off-by: Mike Galbraith <efault@gmx.de>
2007-10-15 17:00:05 +02:00
Ingo Molnar
5c6b5964a0 sched: simplify check_preempt() methods
simplify the check_preempt() methods.

Signed-off-by: Ingo Molnar <mingo@elte.hu>
Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl>
Signed-off-by: Mike Galbraith <efault@gmx.de>
2007-10-15 17:00:05 +02:00
Peter Zijlstra
6d0f0ebd06 sched: simplify adaptive latency
simplify adaptive latency.

Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl>
Signed-off-by: Ingo Molnar <mingo@elte.hu>
Signed-off-by: Mike Galbraith <efault@gmx.de>
Reviewed-by: Thomas Gleixner <tglx@linutronix.de>
2007-10-15 17:00:05 +02:00
Peter Zijlstra
4d78e7b656 sched: new task placement for vruntime
add proper new task placement for the vruntime based math too.

( note: introduces a swap() macro, but the swap token is too
  widely used in the kernel namespace for a generic version
  to be added without changing non-scheduler code - so this
  cleanup will be done separately. )

Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl>
Signed-off-by: Ingo Molnar <mingo@elte.hu>
Signed-off-by: Mike Galbraith <efault@gmx.de>
Reviewed-by: Thomas Gleixner <tglx@linutronix.de>
2007-10-15 17:00:04 +02:00
Ingo Molnar
6cb5819514 sched: optimize vruntime based scheduling
optimize vruntime based scheduling.

Signed-off-by: Ingo Molnar <mingo@elte.hu>
Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl>
Signed-off-by: Mike Galbraith <efault@gmx.de>
Reviewed-by: Thomas Gleixner <tglx@linutronix.de>
2007-10-15 17:00:04 +02:00
Ingo Molnar
bf5c91ba8c sched: move sched_feat() definitions
move sched_feat() definitions so that it can be used sooner by generic
code too.

Signed-off-by: Ingo Molnar <mingo@elte.hu>
Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl>
Signed-off-by: Mike Galbraith <efault@gmx.de>
Reviewed-by: Thomas Gleixner <tglx@linutronix.de>
2007-10-15 17:00:04 +02:00
Ingo Molnar
e9acbff648 sched: introduce se->vruntime
introduce se->vruntime as a sum of weighted delta-exec's, and use that
as the key into the tree.

the idea to use absolute virtual time as the basic metric of scheduling
has been first raised by William Lee Irwin, advanced by Tong Li and first
prototyped by Roman Zippel in the "Really Fair Scheduler" (RFS) patchset.

also see:

   http://lkml.org/lkml/2007/9/2/76

for a simpler variant of this patch.

Signed-off-by: Ingo Molnar <mingo@elte.hu>
Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl>
Signed-off-by: Mike Galbraith <efault@gmx.de>
Reviewed-by: Thomas Gleixner <tglx@linutronix.de>
2007-10-15 17:00:04 +02:00
Ingo Molnar
08e2388aa1 sched: clean up calc_weighted()
clean up calc_weighted() - we always use the normalized shift so
it's not needed to pass that in. Also, push the non-nice0 branch
into the function.

Signed-off-by: Ingo Molnar <mingo@elte.hu>
Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl>
Signed-off-by: Mike Galbraith <efault@gmx.de>
Reviewed-by: Thomas Gleixner <tglx@linutronix.de>
2007-10-15 17:00:04 +02:00
Ingo Molnar
19ccd97a03 sched: uninline __enqueue_entity()/__dequeue_entity()
suggested by Roman Zippel: uninline __enqueue_entity() and
__dequeue_entity().

this reduces code size:

      text    data     bss     dec     hex filename
     25385    2386      16   27787    6c8b sched.o.before
     25257    2386      16   27659    6c0b sched.o.after

Signed-off-by: Ingo Molnar <mingo@elte.hu>
Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl>
Signed-off-by: Mike Galbraith <efault@gmx.de>
Reviewed-by: Thomas Gleixner <tglx@linutronix.de>
2007-10-15 17:00:04 +02:00
Peter Zijlstra
e59c80c5bb sched: simplify SCHED_FEAT_* code
Peter Zijlstra suggested to simplify SCHED_FEAT_* checks via the
sched_feat(x) macro.

No code changed:

   text    data     bss     dec     hex filename
   38895    3550      24   42469    a5e5 sched.o.before
   38895    3550      24   42469    a5e5 sched.o.after

Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl>
Signed-off-by: Ingo Molnar <mingo@elte.hu>
Signed-off-by: Mike Galbraith <efault@gmx.de>
Reviewed-by: Thomas Gleixner <tglx@linutronix.de>
2007-10-15 17:00:03 +02:00
Ingo Molnar
429d43bcc0 sched: cleanup: simplify cfs_rq_curr() methods
cleanup: simplify cfs_rq_curr() methods - now that the cfs_rq->curr
pointer is unconditionally present, remove the wrappers.

  kernel/sched.o:
      text    data     bss     dec     hex filename
     11784     224    2012   14020    36c4 sched.o.before
     11784     224    2012   14020    36c4 sched.o.after

Signed-off-by: Ingo Molnar <mingo@elte.hu>
Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl>
Signed-off-by: Mike Galbraith <efault@gmx.de>
Reviewed-by: Thomas Gleixner <tglx@linutronix.de>
2007-10-15 17:00:03 +02:00
Ingo Molnar
62160e3f4a sched: track cfs_rq->curr on !group-scheduling too
Noticed by Roman Zippel: use cfs_rq->curr in the !group-scheduling
case too. Small micro-optimization and cleanup effect:

   text    data     bss     dec     hex filename
   36269    3482      24   39775    9b5f sched.o.before
   36177    3486      24   39687    9b07 sched.o.after

Signed-off-by: Ingo Molnar <mingo@elte.hu>
Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl>
Signed-off-by: Mike Galbraith <efault@gmx.de>
Reviewed-by: Thomas Gleixner <tglx@linutronix.de>
2007-10-15 17:00:03 +02:00
Ingo Molnar
a25707f3ae sched: remove precise CPU load
CPU load calculations are statistical anyway, and there's little benefit
from having it calculated on every scheduling event. So remove this code,
it gets rid of a divide from the scheduler wakeup and context-switch
fastpath.

Signed-off-by: Ingo Molnar <mingo@elte.hu>
Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl>
Signed-off-by: Mike Galbraith <efault@gmx.de>
Reviewed-by: Thomas Gleixner <tglx@linutronix.de>
2007-10-15 17:00:03 +02:00
Ingo Molnar
8ebc91d936 sched: remove stat_gran
remove the stat_gran code - it was disabled by default and it causes
unnecessary overhead.

Signed-off-by: Ingo Molnar <mingo@elte.hu>
Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl>
Signed-off-by: Mike Galbraith <efault@gmx.de>
Reviewed-by: Thomas Gleixner <tglx@linutronix.de>
2007-10-15 17:00:03 +02:00
Ingo Molnar
2bd8e6d422 sched: use constants if !CONFIG_SCHED_DEBUG
use constants if !CONFIG_SCHED_DEBUG.

this speeds up the code and reduces code-size:

    text    data     bss     dec     hex filename
   27464    3014      16   30494    771e sched.o.before
   26929    3010      20   29959    7507 sched.o.after

Signed-off-by: Ingo Molnar <mingo@elte.hu>
Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl>
Signed-off-by: Mike Galbraith <efault@gmx.de>
Reviewed-by: Thomas Gleixner <tglx@linutronix.de>
2007-10-15 17:00:02 +02:00
Ingo Molnar
eba1ed4b7e sched: debug: track maximum 'slice'
track the maximum amount of time a task has executed while
the CPU load was at least 2x. (i.e. at least two nice-0
tasks were runnable)

Signed-off-by: Ingo Molnar <mingo@elte.hu>
Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl>
Signed-off-by: Mike Galbraith <efault@gmx.de>
Reviewed-by: Thomas Gleixner <tglx@linutronix.de>
2007-10-15 17:00:02 +02:00
Ingo Molnar
bb61c21083 sched: resched task in task_new_fair()
to get full child-runs-first semantics make sure the parent is
rescheduled.

Signed-off-by: Ingo Molnar <mingo@elte.hu>
Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl>
Signed-off-by: Mike Galbraith <efault@gmx.de>
Reviewed-by: Thomas Gleixner <tglx@linutronix.de>
2007-10-15 17:00:02 +02:00
Ingo Molnar
30084fbd1c sched: fix profile=sleep
fix sleep profiling - we lost this chunk in the CFS merge.

Found-by: Mel Gorman <mel@csn.ul.ie>
Signed-off-by: Ingo Molnar <mingo@elte.hu>
2007-10-02 14:13:08 +02:00
Ingo Molnar
1799e35d5b sched: add /proc/sys/kernel/sched_compat_yield
add /proc/sys/kernel/sched_compat_yield to make sys_sched_yield()
more agressive, by moving the yielding task to the last position
in the rbtree.

with sched_compat_yield=0:

   PID USER      PR  NI  VIRT  RES  SHR S %CPU %MEM    TIME+  COMMAND
  2539 mingo     20   0  1576  252  204 R   50  0.0   0:02.03 loop_yield
  2541 mingo     20   0  1576  244  196 R   50  0.0   0:02.05 loop

with sched_compat_yield=1:

   PID USER      PR  NI  VIRT  RES  SHR S %CPU %MEM    TIME+  COMMAND
  2584 mingo     20   0  1576  248  196 R   99  0.0   0:52.45 loop
  2582 mingo     20   0  1576  256  204 R    0  0.0   0:00.00 loop_yield

Signed-off-by: Ingo Molnar <mingo@elte.hu>
Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl>
2007-09-19 23:34:46 +02:00
Peter Zijlstra
1169783085 sched: fix ideal_runtime calculations for reniced tasks
fix ideal_runtime:

  - do not scale it using niced_granularity()
    it is against sum_exec_delta, so its wall-time, not fair-time.

  - move the whole check into __check_preempt_curr_fair()
    so that wakeup preemption can also benefit from the new logic.

this also results in code size reduction:

   text    data     bss     dec     hex filename
  13391     228    1204   14823    39e7 sched.o.before
  13369     228    1204   14801    39d1 sched.o.after

Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl>
Signed-off-by: Ingo Molnar <mingo@elte.hu>
2007-09-05 14:32:49 +02:00
Peter Zijlstra
4a55b45036 sched: improve prev_sum_exec_runtime setting
Second preparatory patch for fix-ideal runtime:

Mark prev_sum_exec_runtime at the beginning of our run, the same spot
that adds our wait period to wait_runtime. This seems a more natural
location to do this, and it also reduces the code a bit:

   text    data     bss     dec     hex filename
  13397     228    1204   14829    39ed sched.o.before
  13391     228    1204   14823    39e7 sched.o.after

Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl>
Signed-off-by: Ingo Molnar <mingo@elte.hu>
2007-09-05 14:32:49 +02:00
Peter Zijlstra
7c92e54f6f sched: simplify __check_preempt_curr_fair()
Preparatory patch for fix-ideal-runtime:

simplify __check_preempt_curr_fair(): get rid of the integer return.

   text    data     bss     dec     hex filename
  13404     228    1204   14836    39f4 sched.o.before
  13393     228    1204   14825    39e9 sched.o.after

functionality is unchanged.

Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl>
Signed-off-by: Ingo Molnar <mingo@elte.hu>
2007-09-05 14:32:49 +02:00
Ingo Molnar
a206c07213 sched: debug: fix cfs_rq->wait_runtime accounting
the cfs_rq->wait_runtime debug/statistics counter was not maintained
properly - fix this.

this also removes some code:

   text    data     bss     dec     hex filename
  13420     228    1204   14852    3a04 sched.o.before
  13404     228    1204   14836    39f4 sched.o.after

Signed-off-by: Ingo Molnar <mingo@elte.hu>
Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl>
2007-09-05 14:32:49 +02:00
Ingo Molnar
a0dc72601d sched: fix niced_granularity() shift
fix niced_granularity(). This resulted in under-scheduling for
CPU-bound negative nice level tasks (and this in turn caused
higher than necessary latencies in nice-0 tasks).

Signed-off-by: Ingo Molnar <mingo@elte.hu>
2007-09-05 14:32:49 +02:00
Ingo Molnar
9f508f8258 sched: clean up task_new_fair()
cleanup: we have the 'se' and 'curr' entity-pointers already,
no need to use p->se and current->se.

Signed-off-by: Ingo Molnar <mingo@elte.hu>
Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl>
Signed-off-by: Mike Galbraith <efault@gmx.de>
2007-08-28 12:53:24 +02:00
Ingo Molnar
213c8af67f sched: small schedstat fix
small schedstat fix: the cfs_rq->wait_runtime 'sum of all runtimes'
statistics counters missed newly forked tasks and thus had a constant
negative skew. Fix this.

Signed-off-by: Ingo Molnar <mingo@elte.hu>
Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl>
Signed-off-by: Mike Galbraith <efault@gmx.de>
2007-08-28 12:53:24 +02:00
Ingo Molnar
b77d69db9f sched: fix wait_start_fair condition in update_stats_wait_end()
Peter Zijlstra noticed the following bug in SCHED_FEAT_SKIP_INITIAL (which
is disabled by default at the moment): it relies on se.wait_start_fair
being 0 while update_stats_wait_end() did not recognize a 0 value,
so instead of 'skipping' the initial interval we gave the new child
a maximum boost of +runtime-limit ...

(No impact on the default kernel, but nice to fix for completeness.)

Signed-off-by: Ingo Molnar <mingo@elte.hu>
Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl>
Signed-off-by: Mike Galbraith <efault@gmx.de>
2007-08-28 12:53:24 +02:00
Ting Yang
7109c4429a sched: call update_curr() in task_tick_fair()
update the fair-clock before using it for the key value.

[ mingo@elte.hu: small cleanups. ]

Signed-off-by: Ting Yang <tingy@cs.umass.edu>
Signed-off-by: Ingo Molnar <mingo@elte.hu>
Signed-off-by: Mike Galbraith <efault@gmx.de>
Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl>
2007-08-28 12:53:24 +02:00
Ingo Molnar
f6cf891c4d sched: make the scheduler converge to the ideal latency
de-HZ-ification of the granularity defaults unearthed a pre-existing
property of CFS: while it correctly converges to the granularity goal,
it does not prevent run-time fluctuations in the range of
[-gran ... 0 ... +gran].

With the increase of the granularity due to the removal of HZ
dependencies, this becomes visible in chew-max output (with 5 tasks
running):

 out:  28 . 27. 32 | flu:  0 .  0 | ran:    9 .   13 | per:   37 .   40
 out:  27 . 27. 32 | flu:  0 .  0 | ran:   17 .   13 | per:   44 .   40
 out:  27 . 27. 32 | flu:  0 .  0 | ran:    9 .   13 | per:   36 .   40
 out:  29 . 27. 32 | flu:  2 .  0 | ran:   17 .   13 | per:   46 .   40
 out:  28 . 27. 32 | flu:  0 .  0 | ran:    9 .   13 | per:   37 .   40
 out:  29 . 27. 32 | flu:  0 .  0 | ran:   18 .   13 | per:   47 .   40
 out:  28 . 27. 32 | flu:  0 .  0 | ran:    9 .   13 | per:   37 .   40

average slice is the ideal 13 msecs and the period is picture-perfect 40
msecs. But the 'ran' field fluctuates around 13.33 msecs and there's no
mechanism in CFS to keep that from happening: it's a perfectly valid
solution that CFS finds.

to fix this we add a granularity/preemption rule that knows about
the "target latency", which makes tasks that run longer than the ideal
latency run a bit less. The simplest approach is to simply decrease the
preemption granularity when a task overruns its ideal latency. For this
we have to track how much the task executed since its last preemption.

( this adds a new field to task_struct, but we can eliminate that
  overhead in 2.6.24 by putting all the scheduler timestamps into an
  anonymous union. )

with this change in place, chew-max output is fluctuation-less all
around:

 out:  28 . 27. 39 | flu:  0 .  2 | ran:   13 .   13 | per:   41 .   40
 out:  28 . 27. 39 | flu:  0 .  2 | ran:   13 .   13 | per:   41 .   40
 out:  28 . 27. 39 | flu:  0 .  2 | ran:   13 .   13 | per:   41 .   40
 out:  28 . 27. 39 | flu:  0 .  2 | ran:   13 .   13 | per:   41 .   40
 out:  28 . 27. 39 | flu:  0 .  1 | ran:   13 .   13 | per:   41 .   40
 out:  28 . 27. 39 | flu:  0 .  1 | ran:   13 .   13 | per:   41 .   40

this patch has no impact on any fastpath or on any globally observable
scheduling property. (unless you have sharp enough eyes to see
millisecond-level ruckles in glxgears smoothness :-)

Signed-off-by: Ingo Molnar <mingo@elte.hu>
Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl>
Signed-off-by: Mike Galbraith <efault@gmx.de>
2007-08-28 12:53:24 +02:00
Mike Galbraith
5f01d519e6 sched: fix sleeper bonus limit
There is an Amarok song switch time increase (regression) under
hefty load.

What is happening is that sleeper_bonus is never consumed, and only
rarely goes below runtime_limit, so for the most part, Amarok isn't
getting any bonus at all.  We're keeping sleeper_bonus right at
runtime_limit (sched_latency == sched_runtime_limit == 40ms) forever, ie
we don't consume if we're lower that that, and don't add if we're above
it.  One Amarok thread waking (or anybody else) will push us past the
threshold, so the next thread waking gets nada, but will reap pain from
the previous thread waking until we drop back to runtime_limit.  It
looks to me like under load, some random task gets a bonus, and
everybody else pays, whether deserving or not.

This diff fixed the regression for me at any load rate.

Signed-off-by: Mike Galbraith <efault@gmx.de>
Signed-off-by: Ingo Molnar <mingo@elte.hu>
Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl>
2007-08-28 12:53:24 +02:00
Ingo Molnar
172ac3dbb7 sched: cleanup, sched_granularity -> sched_min_granularity
due to adaptive granularity scheduling the role of sched_granularity
has changed to "minimum granularity", so rename the variable (and the
tunable) accordingly.

Signed-off-by: Ingo Molnar <mingo@elte.hu>
Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl>
2007-08-25 18:41:53 +02:00
Peter Zijlstra
218050855e sched: adaptive scheduler granularity
Instead of specifying the preemption granularity, specify the wanted
latency. By fixing the granlarity to a constany the wakeup latency
it a function of the number of running tasks on the rq.

Invert this relation.

sysctl_sched_granularity becomes a minimum for the dynamic granularity
computed from the new sysctl_sched_latency.

Then use this latency to do more intelligent granularity decisions: if
there are fewer tasks running then we can schedule coarser. This helps
performance while still always keeping the latency target.

Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl>
Signed-off-by: Ingo Molnar <mingo@elte.hu>
2007-08-25 18:41:53 +02:00
Ingo Molnar
095e56c703 sched: fix startup penalty calculation
fix task startup penalty miscalculation: sysctl_sched_granularity is
unsigned int and wait_runtime is long so we first have to convert it
to long before turning it negative ...

Signed-off-by: Ingo Molnar <mingo@elte.hu>
2007-08-24 20:39:10 +02:00
Peter Zijlstra
ea0aa3b23a sched: simplify bonus calculation #2
current code:

 delta = calc_delta_mine(delta_exec, curr->load.weight, lw);
 delta = min((u64)delta, cfs_rq->sleeper_bonus);

Notice that this calc_delta_mine() line is exactly delta_mine, which
gives:

 delta = min((u64)delta_mine, cfs_rq->sleeper_bonus);

Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl>
Signed-off-by: Ingo Molnar <mingo@elte.hu>
2007-08-24 20:39:10 +02:00
Peter Zijlstra
a6f2994042 sched: simplify bonus calculation #1
current code:

 delta = min(cfs_rq->sleeper_bonus, (u64)delta_exec);
 delta = calc_delta_mine(delta, curr->load.weight, lw);
 delta = min((u64)delta, cfs_rq->sleeper_bonus);

drop the first min(), because we clip against sleeper_bonus in the 3rd line
again. That gives:

 delta = calc_delta_mine(delta_exec, curr->load.weight, lw);
 delta = min((u64)delta, cfs_rq->sleeper_bonus);

Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl>
Signed-off-by: Ingo Molnar <mingo@elte.hu>
2007-08-24 20:39:10 +02:00
Ingo Molnar
b2133c8b1e sched: tidy up and simplify the bonus balance
make the bonus balance more consistent: do not hand out a bonus if
there's too much in flight already, and only deduct as much from a
runner as it has the capacity. This makes the bonus engine a zero-sum
game (as intended).

this also simplifies the code:

   text    data     bss     dec     hex filename
  34770    2998      24   37792    93a0 sched.o.before
  34749    2998      24   37771    938b sched.o.after

and it also avoids overscheduling in sleep-happy workloads like
hackbench.c.

Signed-off-by: Ingo Molnar <mingo@elte.hu>
2007-08-24 20:39:10 +02:00
Ingo Molnar
71fd371463 sched: remove HZ dependency from the granularity default
remove HZ dependency from the granularity default. Use 10 msec for
the base granularity, 1 msec for wakeup granularity and 25 msec for
batch wakeup granularity. (These defaults are close to the values
that the default HZ=250 setting got previously, and thus it's the
most common setting.)

Signed-off-by: Ingo Molnar <mingo@elte.hu>
2007-08-24 20:39:10 +02:00
Bruce Ashfield
7c6c16f354 sched: CONFIG_SCHED_GROUP_FAIR=y fixlet
when I built with CONFIG_FAIR_GROUP_SCHED=y, I need the following change
to make things right.

[ From: mingo@elte.hu ]

this config option is not upstream-configurable right now but lets fix
this for completeness.

Signed-off-by: Bruce Ashfield <bruce.ashfield@windriver.com>
Signed-off-by: Ingo Molnar <mingo@elte.hu>
2007-08-24 20:39:10 +02:00
Ingo Molnar
5d2b3d3695 sched: fix sleeper bonus
Peter Ziljstra noticed that the sleeper bonus deduction code
was not properly rate-limited: a task that scheduled more
frequently would get a disproportionately large deduction.
So limit the deduction to delta_exec.

Signed-off-by: Ingo Molnar <mingo@elte.hu>
2007-08-12 18:08:19 +02:00
Ingo Molnar
e56f31aad9 sched: fix typo in the FAIR_GROUP_SCHED branch
while there's no in-tree way to turn group scheduling at the moment,
fix a typo in it nevertheless.

Signed-off-by: Ingo Molnar <mingo@elte.hu>
2007-08-10 23:05:11 +02:00
Ingo Molnar
7cff8cf61c sched: refine negative nice level granularity
refine the granularity of negative nice level tasks: let them
reschedule more often to offset the effect of them consuming
their wait_runtime proportionately slower. (This makes nice-0
task scheduling smoother in the presence of negatively
reniced tasks.)

Signed-off-by: Ingo Molnar <mingo@elte.hu>
2007-08-09 11:16:52 +02:00
Ingo Molnar
a69edb5560 sched: fix update_stats_enqueue() reniced codepath
the key has to be rescaled to /weight even if it has a positive value.

(this change only affects the scheduling of reniced tasks)

Signed-off-by: Ingo Molnar <mingo@elte.hu>
2007-08-09 11:16:52 +02:00